What I Changed My Mind About While Building Stamped This Week
I spent part of this week in Mumbai. The rest was Stamped: explaining what we are building, cutting positioning that sounded cheap, and listening to people who have run furnaces longer than I have been at IIT Roorkee.
This week was shifts in how I talk and what I prioritise in the product story, not a new rollout headline.
The question I actually ask now
On 4 November I posted on LinkedIn:
So I’ve stopped asking plant teams what they should fix. I ask what annoys them the most. That’s usually where the sin is.
That is the only sentence this week where I stated a behaviour change in my own words. I am keeping it as the spine because it is public and because it matches what I did on calls: stop prescribing fixes from a deck and start from the daily irritant.
Leading with mechanism, not the AI category
Earlier this month I pushed back hard when a draft script opened with “we’re building AI.” I do not think that line earns trust on a shop floor. What I want to say first is what the system does to the rejection path: which signals it joins, what it learns per machine, what action it suggests before scrap is locked in.
Each machine gets its own baseline model that keeps learning that machine’s normal, not a single plant-wide average pasted onto every line. That is how Stamped runs on the lines where Vinayak and I have scoped it. I am not naming customers or quoting rupees line by line.
I also rewrote founder-facing copy so the story opens with actions that bring rejection rates down, not with a category label. Process optimisation and quality are the same argument on a heat-treat line.
Audits versus continuous control
A one-time audit snapshot goes stale the week someone changes a soak profile or a supplier lot. I have been saying process control has to be continuous for that reason.
My view, not a universal industry law: most quality tooling I have seen on these calls is built around visual surface inspection. Stamped maps raw machine data to each component’s quality context so the chart and the part stay tied. In client plants where Stamped has been used, rejections fell about 30% and energy use about 10%.
A long call that sharpened the mechanism-first point
On 3 November a long call with an experienced manufacturing person pushed the same ordering: thermocouple loop first, mechanism before headline rates, proof stacked in stages. I wrote the open questions that call left me with in a conversation I’m still thinking about.
What I am not claiming
- Any named customer, integration detail, or rupee-by-line savings figure from this week.
- That every plant’s quality stack matches my description of surface-only inspection (it is what I keep hearing).
- That Mumbai meetings changed a metric I can publish (I am not describing those meetings at all).
If you are building for plants in India and you stopped opening with “AI,” tell me what you lead with instead. I am still calibrating.